Photo-based line-item suggestions still need source verification

An early demonstration described using prior estimating examples. Its dataset, permissions and training process were not published here; judge the suggested work against the actual job.

Editorial illustration for Photo-based line-item suggestions still need source verification

Estimators stopped keeping secrets, and that changed everything

The video starts with a post in Restoration Rebels, a Facebook group where much of the industry congregates: what line items are we leaving off the table? A generation ago estimators guarded their code knowledge. Now those questions get asked and answered in public, in group after group, year after year.

The presenter described collecting discussions and combining them with prior estimating examples. This article does not publish a dataset manifest, permissions review or training record verifying that account. Public visibility is not itself permission to reuse material. Training, retrieval and reference lookup are different processes, and the article should not conflate them.

From evidence to a list of work to review
  1. 01Photographs

    Identify the documented work.

  2. 02Line items

    Build a relevant candidate list.

  3. 03Estimator

    Check quantities and activities.

Automating Xactimate Estimates - AI and the Future of Claims
Source recording: Automating Xactimate Estimates - AI and the Future of Claims. Read the article for updates to the original recording.

Photos in, common line items out

The video describes a kitchen water-loss example returning suggested items from prior examples. The underlying retrieval and scoring records are not supplied here, so the presentation does not establish that the suggested items were the most common or correct for comparable losses.

The claim is not that the output is a finished estimate, though that is where this work eventually went. It is that a large chunk of the estimate is already written before you look at a single photo yourself. The estimator starts from a list grounded in how comparable losses were actually planned, then confirms, corrects, and completes it.

Kitchen water-loss photos returning the line items most commonly used on similar losses.
From the video: two photos in, a written line item list out.

What this buys the desk

Two things, per the video: more detailed lists of work, because the model surfaces codes you might have left off the table, and more efficiency, because the first pass is written for you. Time saved at the desk is time back in the field.

This early work is the foundation of what Axiom does today. Existing job documentation builds a room-by-room estimate with suggested codes and quantities, and your estimator reviews all of it before downloading the ESX. The point was never to replace the estimator. It was to stop making them start from zero.

The point was never to replace the estimator; it was to stop making them start from zero.

Review the proposed work

Check each activity, unit and quantity against the observed conditions and current catalog. A suggestion can identify work to investigate; it does not establish that the work belongs on this loss. Record unsupported additions as well as missed items.

For a stronger evaluation, retain the source files, reference estimate, first estimate and corrections, then follow the exact file through export and native import.

For documented mold remediation work, check each suggested item against the defined work area and project instructions; a suggested code does not establish the technical requirement.